Ultrapure water machine is a water treatment device that removes solid impurities, salt ions, bacteria and viruses in water through filtration, reverse osmosis, electrodialysis, ion exchanger, ultraviolet sterilization and other methods. In order to ensure the use effect of the ultrapure water machine, the equipment needs to be properly debugged after installation and before official use. Let's talk about the correct debugging method.

1. After installation, open the electroplated ball valve on the faucet pipeline, close the recoil ball valve, and then open the pressure tank ball valve.

2. Insert the transformer wire plug into the power socket, at this time the pump starts, and the RO water purifier starts to produce water.

3. Check the discharge of the primary filtered water: When making water, the filtered pure water enters the pressure tank. On the other hand, the primary filtered water of the reverse osmosis membrane is discharged through the waste water scaler pipeline. Open the recoil ball valve, check whether there is a lot of primary filtered water discharged, and then close it.

4. Try to start and stop automatically: it takes about an hour and a half to make pure water to fill the pressure tank. In order to quickly determine the action, close the pressure bucket ball valve after 5 minutes. At this time, the pressure in the pipeline increases to a certain value, and the high pressure switch should jump to stop the high pressure pump. Then turn on the gooseneck faucet to release water, and the high-pressure pump should automatically start running. Repeat this operation several times to check whether the high-pressure pump starts and stops automatically. After confirming that the action is normal, open the pressure tank ball valve.

5. Test the action of the low pressure switch: close the electroplating ball valve on the tap water pipeline, indicating the preset state of no water or water shortage, then the low pressure switch should act to automatically stop the high pressure pump to prevent the high pressure pump from idling without water and being damaged. After the trial operation is normal, open the electroplating ball valve on the water source pipeline.

6. After the ultrapure water machine is installed, open the electroplating ball valve on the faucet pipeline, close the recoil ball valve, and then open the pressure bucket ball valve.

7. When no water is used after the automatic stop of the test, there should be no water flowing out of the primary filtered water discharge pipe: after 5 to 10 minutes of test operation, close the pressure bucket ball valve, and after the high-pressure pump stops automatically, check whether there is water discharged from the primary filtered water The tube continuously flows out.

8. Check the joints and pipes for water leakage: During the trial operation, after automatic start and stop, check all parts, components and joints for water leakage.

9. Check the water quality: After everything works normally, let the high-pressure pump run to make water, and check whether the water quality of the gooseneck faucet meets the standard. After completing the installation and debugging, let the machine run normally for about ten minutes, open the gooseneck faucet to let the water created in the initial stage run out completely, and then close the gooseneck faucet.

After the ultrapure water machine runs for a period of time, due to the difference in the quality of the incoming water, it will cause different degrees of pollution to the parts of the pure water machine. Therefore, in order for the pure water machine to operate normally and stably, the accessories need to be cleaned or replaced regularly.

The above is the correct debugging method of the ultrapure water machine. The debugging link before the official use is very important and cannot be ignored. Only the correct debugging can make the equipment better.