Quickly master the installation secrets of laboratory wastewater treatment integrated equipment and pipelines!

Release time:2021-01-14    Views:1794

      Every part of any instrument is very important. The lack of any part will affect the overall work. Whether any part is installed correctly will also affect its use effect. The same is true of the integrated laboratory wastewater treatment equipment. Therefore, in order to better In order to use the equipment properly, the operator should also have a certain understanding of the installation of its various components. Let's talk about the installation of the equipment pipeline in detail.

In the process of installing the integrated laboratory wastewater treatment equipment, attention should be paid to the installation of its pipelines, including:

1. Before installing the pipeline, check the diameter and wall thickness of the pipeline to see if they meet the requirements of the drawings. After confirming that they are correct, check the cleanliness of the inside of the pipeline. After confirming that there is no foreign matter, matching and welding can be carried out.

2. The pipeline should be straight when it is connected, and there should be no skew and additional tension when connecting with the hospital sewage disinfection equipment. It should be done naturally after the equipment is installed and positioned and the anchor bolts are tightened. The position of the opening of the water discharge and the instrument pipe should not be less than 50mm from the edge of the opening, and should not be smaller than the diameter of the hole.

3. When the welding of the opposite ends is completed, there should be a certain gap between the nozzles according to the requirements of the welding form and the groove form. The surface inspection of the groove should meet the requirement that there is no oil, paint or rust within the range of 10-15 mm from the nozzle. , burrs and other debris, and the surface is free of cracks, interlayers and other defects. The straight welds between the pipes should be staggered by more than 100mm, and should be placed in an easy-to-check position as much as possible. The distance between the two butt welds of the pipeline should not be less than the outer diameter of the pipeline and not less than 100mm.

4. At the same time as the pipeline installation, the fixing and adjustment of the support and hanger should also be carried out. The position and model of the support and hanger should be correct, the installation meets the requirements, and the pipe and the supporting surface are in good contact.

According to the above method, the pipeline of the integrated laboratory wastewater treatment equipment can be installed correctly, and I hope to help everyone use the equipment more.